I ran into the same headache with demo work, and getting my 1403 stuff squared away early saved me from a stop‑work order. Having the survey and notification ready to show on-site made inspectors chill instead of stressed. If you want a quick breakdown of what needs to be in place, you can read more here since that’s where I double‑checked the timelines and paperwork before starting.